Financial Projects
Missouri Bank, Historic Restoration Project, Missouri, USA
![]() |
Installation Date: |
| 1998 | |
| Project Size: | |
| 2,250 kW | |
| Geothermal Configuration: | |
Closed loop – 56,150 meters bore hole – grouting bentonite and cement |
|
| Annual Energy Savings Estimated: | |
| 37% |
Project Scope: Replace window air conditioning units, and the oil boiler with geothermal heat pumps.
Due to limited space the vertical bore holes were drilled in the streets that surround the building on three sides.






